Construction of ezhuthonipadam aqueduct between Ch. 18220 and Ch. 18275.50.
Entrusted to KIIDC in 2016 – Completed in 2018 The left bank canal of Moovattupuzha Valley Irrigation Project under Irrigation Department has a length of 37.10 km. It is designed to irrigate an area of 13,592 ha. The right bank canal is 28.34 km long to irrigate 5024 ha. The Ettumanoor Branch Canal starts from…