Last update on 24-10-2024 12.49 PM
Name of the Project: Construction of 16 nos Groyne at vattachal in Arattupuzha
Gp
Name of the Project Engineer: Silpa R
Physical Progress (%) :2
Date | Detailed Daily Report | Activities Planned for the Next Day |
---|---|---|
11.06.2021 | 1. 2T Tetrapod casted on date: 29 (cumulative 2069) | 1. 2T Tetrapod casting |